2021-06-24
On June 23th, 2021, 10 units refuse compactor superstructure were loaded in containers at CEEC factory. These waste compactor body kits will be delivered to Shanghai seaport for shipment.
Client: Bahamas customer, Mr. Lorin
Project: Nassau city waste management company project
Year: 2021,06
Project Background:
Mr. Lorin is the purchasing manager of a waste management company in Bahamas. They own a assembly plant in Nassau city. They have 10 units of second hand ISUZU chassis and need to purchase garbage compactor body kits to install on these chassis. He visited our website and is very interested in our waste compactor equipment. After talking with our sales manager, he believes that we can provide him with satisfactory rear loader body and service.
After getting the order, our engineer made CAD drawings according to chassis dimensions to make sure these superstructures will be perfectly fit for his ISUZU chassis. In order to save the shipping cost, our engineer also designed a packing for him to ensure that the 10 rear loader upper bodies can be loaded into 7 units 40'HQ container. Mr. Lorin was very satisfied with our design.
After 20 days of production, these 10 units of waste compactor kits were finished on time. On June 23, these rubbish compactor superstructures were successfully loaded into containers at our factory and delivered to Shanghai seaport for shipment.
.
Key Pointes:
→10CBM garbage compactor superstructure
Rear loader body kit were ready for delivred
Garbage compactor upper body in workshop
Trash compactor body equipment are ready for shipment
Refuse compactor body kit was loaded into container
How to load a waste compactor body into container
Rubbish compactor superstructure was loaded in container
Rear loading compactor kit was loaded
Back loading compactor body was loaded
26 units ISUZU garbage compactor trucks were exported to Africa
Guinea-20 units SHACMAN dump truck for mine working